One sheet set, numbered and revision-controlled
Every drawing carries a code, an issue date and a revision letter. The set you approve is the set the contractor builds from, and nothing is amended in silence.
A-01 · Existing plans
Measured walls, ceiling heights and riser positions, with load-bearing lines flagged for structural review before anything is moved.
A-02 · Demolition
Walls to remove shown hatched, protected elements listed by room, and temporary propping notes wherever an opening is widened.
A-03 · New layout
Proposed partitions, door swings and furniture setting-out, with floor finish breaks keyed directly to the material schedule.
E-01 and P-01 · Services
Socket and switch heights, lighting circuits, and water supply and waste runs drawn with gradients and pipe diameters noted.
- Title blocks carry the issue date and revision letter. A changed sheet returns with a new letter.
- Superseded sheets move to an archive, so the contractor link shows the current set only.
- Clarifications are logged against the sheet they resolve, dated and role-tagged.